We were awarded the works to carry out External Soft/Hard Landscaping for Channing School after the school had witnessed our standard of work on a Thames Water sewer connection that they initially asked us to complete.
The external hard landscaping package consisted of multiple leveled paving areas connected by series of steps that all had to be created from formwork and concrete poured. There were a variety of paths and path finishings that required multiple groundwork skill sets.
There was limited information available to us the civil engineering contractor to enable a clearly defined finish. This meant an element of interpretation was needed to compete this civils package. The experience of SB Civil Engineering operatives meant that the client was delighted with the ens result.